Thomas Bow City Asphalt were delighted to secure their first contract with this prestige brand and demonstrate their capabilities in car and lorry park construction on this green field site.
The project involved the complete transformation of the 48,000m2 greenfield site located next to the manufacturing facility into a 1,800 space car park and 20 space lorry park.
After securing the contract the team rose to the challenge of supporting the client in the early opening of the concrete lorry park as part of a larger site strategy. Drawing on our labour resources the works were accelerated in spite of tough weather conditions through the winter months and opened on time.
The team, led by John Allen, Major Projects and Compliance Director ensured this job delivered the high standards befitting of the Bentley brand.